How many times have you had a project day become a death-march unexpectedly? I was finishing up the wiring for the darkroom lights and I noticed a quiet tap - tap - tap sound. "Self, that sounds like dripping water," I told myself. Oh, boy, right again! I had these little flow-meters inline in the temporary plumbing to the darkroom sink, and one of them had cracked. It was rated for 100+PSI and had managed to break under 30PSI. I thought I'd just patch it out with a connector but then I realized I didn't have much else going on, so - why not just re-do the plumbing? After all, I was going to have to depressurize and drain the system, which would make a mess, and maybe I should just make the "mess to end all messes" and get it over with. So I started grabbing tools, put AC/DC on the iPad, and began destroying things.
Spinning Out Of Control
Of course a death-march project doesn't ever go as planned. When I drained one of the lines, the other one air-bubbled and leaked water all over everything. So I cleaned that up and, in the process, decided that I was going to have to pull the black sink off the wall to get at the pipe connectors, which meant that I may as well fix the drain while I was at it. I had connected the drain originally to one of the sink drains, and now I thought it would be better to connect it into one of the commode drains - a straighter drop, less likely to freeze, or block. So I grabbed the saws-all and chopped the drain out, dismounted the sink from the wall, and turned the music up as loud as it would go.
Since the room's electrical system wasn't hooked up, yet, I had all the power coming into the room via an extension cord on the floor, which got nice and wet and popped a circuit breaker. "Well! How convenient!" thought I - now was a good time to patch the interior electrical runs into the building's mains. I swapped tool-sets and crawled into the breakout area, LED flashlight clenched in my teeth so I could see. It should have been a 5 minute job but it took half an hour; the wires in the wall conduit were unlabelled and I had to figure them out. No problem.
The Lights Come On
big
Safe Lights
The safe-lights are mounted in a pair of machine-punk brackets that I made out of plywood and stuff, containing red-sleeved flourescent tubes. As you can see, when they're the only light in the room, it looks pretty techno-gothic in there. The speakers in the darkroom are powered self-amplified reference monitors, so they're on the "accessory" circuit along with the safe-lights. I pretty much am never in the darkroom without music, and safe-lights, so putting them on the same control switch seemed like a good idea.
big
Viewing Light
The image-viewing light is on a foot switch on the floor, so I can turn it on without risking dropping a plate while I fumble for a light-switch. I put a high-output clear white LED in it that closely simulates daylight; it ought to do the job nicely.
big
Left Side of Room
This is the way it looks with the room side-lights on. I used focused LED spotlights, because I figured that they'd make sharp, eerie-looking highlights. It works with all that stainless steel, doesn't it? If you look on the sink's counter to the right, you can see the wooden drying rack for wet-plates, and some of my prep area. When I'm getting a plate ready to sensitize, I clean it with paper towels and a few drops of ethanol then flow the collodion over it before putting it into the silver nitrate to sensitize. You can see the collodion bottle just peeking out from behind the paper towels.
big
Right Side of Room
The wooden tanks you can see in the sink are the silver nitrate tank and the cyanide clearing tank. When I've flowed a plate with collodion, it's ready to go in the silver to sensitize as soon as it's gelled up (about 20-30 seconds) At this point I'd turn the lights off and put the plate in the tank under protection of red light. I have a witchy-cool radio-controlled switch that I will use to turn on and off the room lights without having to run back and forth. The trays in the sink are used for pouring developer on the plates and rinsing them clear of chemicals.
I'm not showing a picture of the front of the room because the armored can-lights aren't both installed, yet. When one of them came from Amazon.com, the jar was broken. And, somehow I managed to only order 5 when I needed 6. That will be a snap to install once it's all arrived but it's exceedingly annoying to have a partially finished project just because you're missing a few parts!
I Lay More Pipe Than Kid Rock
The plumbing is all PEX 1/2" flexible pipe. The way it comes is rolled up, which is why it looks pretty wavy, right now. It should straighten out over time. "Should" being the important word. Normally when you're laying PEX tubing, it's under a floor or in a crawlway, and to go around corners you wouldn't use elbows like I did, here. Because I wanted the plumbing to be a visual element of the room, I exposed it and went crazy with the corners. I deliberately didn't make everything laser-straight, so it would have more of that crazy boiler-room look that I wanted.
big
A Crooked Web
The scale up on the shelf is a vintage Ohaus swiss-made lab scale. It's insanely accurate but it's just there for show. The scale I actually use is the $15 (from amazon.com) Ohaus digital scale on the counter underneath. That corner over there is my developer-mixing area; I've got all my alcohol, acetic acid, ferrous sulfate, etc, sitting right there where it's convenient. See the bottle all the way in the corner? That's 5 pounds of potassium cyanide. If I'm ever tired of being a photographer (or anything else, for that matter) all I need to do is pour some acid in there and breathe deeply. They say that cyanide gas smells like almonds and they're kind of right. The problem is that, by the time you smell the almonds, it's probably too late for you. It's also really nasty stuff if you get it in a cut - basically, the cut won't heal.
big
The Ceiling
This is the insanity I had to do, to make the pipes route around the room, using corners. The water comes in at the ceiling because I run the feed-pipe up through the roof supports, so if I cut the pressure gravity will drain it. In the winter I plan to leave the studio unheated and rather than having it freeze in the ceiling, I can just drop all the pressure by hitting a ball-valve in the basement and opening the faucets. The ball-valves in the ceiling are there because, for $10 worth of ball valves, I can work on the plumbing without having to run back and forth to the basement all day. You might notice that the red pipe is not hooked to anything. That's correct; it's just there for show. But if some day I add a hot water heater it will just drop right in.
I do like the way that the pipes provide some bright color to the room.
big
Knife Switch Plate
I went to Radio Shack and got a 1/16" audio patch cable suitable for connecting to my iPad, then clipped one end off and crimped the grounds and signal cables to some heavier copper wires. This whole set-up is designed to fit in the hole behind the knife-switch.
big
Audio Wires
I got a box of ceramic electric-fence insulators from Agway and ran a course of them across the room, then wrapped big curls of wire across them to the speakers, then soldered 1/4" connectors on the speaker side. I tested it out and I was a bit freaked because when I tried the speaker hook-ups no sound came out. I grabbed my ohmmeter and started checking the circuit and discovered that one of the fuses on the knife-switch was blown. I don't want to know what blows a 200-amp fuse! But it sure wasn't my iPad.
There is no "dark side of the moon." As a matter of fact, it's all dark.
I finished all this at 2:00am. So that was a solid 14-hour assault on the project, including 2 trips to the hardware store and a break for a cheeseburger and a chocolate shake. Damn it, I earned it.
What's Left?
This completes the "technical" part of the project. Everything is now in and working. All that's left is to install a few more nurnies and then paint. "Nurnies", as I was told by Adam Savage, are what special-effects people call those wires and doo-dads that you stick on a piece of set-work or a model to make them look more detailed than they actually are. In the case of the darkroom the remaining nurnies are arches of foam that hopefully will give the room a more mysterious, taller look, and some kind of arched front at the end behind the enlarger. I'm going to take a week or so and go back to working on the van, while I let my subconscious figure out what'll look best. Then I'll paint, which is boring but predictable, and finish the job by painting the floor a nice shade of kelly green.
How many times have you had a project day become a death-march unexpectedly? I was finishing up the wiring for the darkroom lights and I noticed a quiet tap - tap - tap sound. "Self, that sounds like dripping water," I told myself. Oh, boy, right again! I had these little flow-meters inline in the temporary plumbing to the darkroom sink, and one of them had cracked. It was rated for 100+PSI and had managed to break under 30PSI. I thought I'd just patch it out with a connector but then I realized I didn't have much else going on, so - why not just re-do the plumbing? After all, I was going to have to depressurize and drain the system, which would make a mess, and maybe I should just make the "mess to end all messes" and get it over with. So I started grabbing tools, put AC/DC on the iPad, and began destroying things.
Spinning Out Of Control
Of course a death-march project doesn't ever go as planned. When I drained one of the lines, the other one air-bubbled and leaked water all over everything. So I cleaned that up and, in the process, decided that I was going to have to pull the black sink off the wall to get at the pipe connectors, which meant that I may as well fix the drain while I was at it. I had connected the drain originally to one of the sink drains, and now I thought it would be better to connect it into one of the commode drains - a straighter drop, less likely to freeze, or block. So I grabbed the saws-all and chopped the drain out, dismounted the sink from the wall, and turned the music up as loud as it would go.
Since the room's electrical system wasn't hooked up, yet, I had all the power coming into the room via an extension cord on the floor, which got nice and wet and popped a circuit breaker. "Well! How convenient!" thought I - now was a good time to patch the interior electrical runs into the building's mains. I swapped tool-sets and crawled into the breakout area, LED flashlight clenched in my teeth so I could see. It should have been a 5 minute job but it took half an hour; the wires in the wall conduit were unlabelled and I had to figure them out. No problem.
The Lights Come On
big
Safe Lights
The safe-lights are mounted in a pair of machine-punk brackets that I made out of plywood and stuff, containing red-sleeved flourescent tubes. As you can see, when they're the only light in the room, it looks pretty techno-gothic in there. The speakers in the darkroom are powered self-amplified reference monitors, so they're on the "accessory" circuit along with the safe-lights. I pretty much am never in the darkroom without music, and safe-lights, so putting them on the same control switch seemed like a good idea.
big
Viewing Light
The image-viewing light is on a foot switch on the floor, so I can turn it on without risking dropping a plate while I fumble for a light-switch. I put a high-output clear white LED in it that closely simulates daylight; it ought to do the job nicely.
big
Left Side of Room
This is the way it looks with the room side-lights on. I used focused LED spotlights, because I figured that they'd make sharp, eerie-looking highlights. It works with all that stainless steel, doesn't it? If you look on the sink's counter to the right, you can see the wooden drying rack for wet-plates, and some of my prep area. When I'm getting a plate ready to sensitize, I clean it with paper towels and a few drops of ethanol then flow the collodion over it before putting it into the silver nitrate to sensitize. You can see the collodion bottle just peeking out from behind the paper towels.
big
Right Side of Room
The wooden tanks you can see in the sink are the silver nitrate tank and the cyanide clearing tank. When I've flowed a plate with collodion, it's ready to go in the silver to sensitize as soon as it's gelled up (about 20-30 seconds) At this point I'd turn the lights off and put the plate in the tank under protection of red light. I have a witchy-cool radio-controlled switch that I will use to turn on and off the room lights without having to run back and forth. The trays in the sink are used for pouring developer on the plates and rinsing them clear of chemicals.
I'm not showing a picture of the front of the room because the armored can-lights aren't both installed, yet. When one of them came from Amazon.com, the jar was broken. And, somehow I managed to only order 5 when I needed 6. That will be a snap to install once it's all arrived but it's exceedingly annoying to have a partially finished project just because you're missing a few parts!
I Lay More Pipe Than Kid Rock
The plumbing is all PEX 1/2" flexible pipe. The way it comes is rolled up, which is why it looks pretty wavy, right now. It should straighten out over time. "Should" being the important word. Normally when you're laying PEX tubing, it's under a floor or in a crawlway, and to go around corners you wouldn't use elbows like I did, here. Because I wanted the plumbing to be a visual element of the room, I exposed it and went crazy with the corners. I deliberately didn't make everything laser-straight, so it would have more of that crazy boiler-room look that I wanted.
big
A Crooked Web
The scale up on the shelf is a vintage Ohaus swiss-made lab scale. It's insanely accurate but it's just there for show. The scale I actually use is the $15 (from amazon.com) Ohaus digital scale on the counter underneath. That corner over there is my developer-mixing area; I've got all my alcohol, acetic acid, ferrous sulfate, etc, sitting right there where it's convenient. See the bottle all the way in the corner? That's 5 pounds of potassium cyanide. If I'm ever tired of being a photographer (or anything else, for that matter) all I need to do is pour some acid in there and breathe deeply. They say that cyanide gas smells like almonds and they're kind of right. The problem is that, by the time you smell the almonds, it's probably too late for you. It's also really nasty stuff if you get it in a cut - basically, the cut won't heal.
big
The Ceiling
This is the insanity I had to do, to make the pipes route around the room, using corners. The water comes in at the ceiling because I run the feed-pipe up through the roof supports, so if I cut the pressure gravity will drain it. In the winter I plan to leave the studio unheated and rather than having it freeze in the ceiling, I can just drop all the pressure by hitting a ball-valve in the basement and opening the faucets. The ball-valves in the ceiling are there because, for $10 worth of ball valves, I can work on the plumbing without having to run back and forth to the basement all day. You might notice that the red pipe is not hooked to anything. That's correct; it's just there for show. But if some day I add a hot water heater it will just drop right in.
I do like the way that the pipes provide some bright color to the room.
big
Knife Switch Plate
I went to Radio Shack and got a 1/16" audio patch cable suitable for connecting to my iPad, then clipped one end off and crimped the grounds and signal cables to some heavier copper wires. This whole set-up is designed to fit in the hole behind the knife-switch.
big
Audio Wires
I got a box of ceramic electric-fence insulators from Agway and ran a course of them across the room, then wrapped big curls of wire across them to the speakers, then soldered 1/4" connectors on the speaker side. I tested it out and I was a bit freaked because when I tried the speaker hook-ups no sound came out. I grabbed my ohmmeter and started checking the circuit and discovered that one of the fuses on the knife-switch was blown. I don't want to know what blows a 200-amp fuse! But it sure wasn't my iPad.
There is no "dark side of the moon." As a matter of fact, it's all dark.
I finished all this at 2:00am. So that was a solid 14-hour assault on the project, including 2 trips to the hardware store and a break for a cheeseburger and a chocolate shake. Damn it, I earned it.
What's Left?
This completes the "technical" part of the project. Everything is now in and working. All that's left is to install a few more nurnies and then paint. "Nurnies", as I was told by Adam Savage, are what special-effects people call those wires and doo-dads that you stick on a piece of set-work or a model to make them look more detailed than they actually are. In the case of the darkroom the remaining nurnies are arches of foam that hopefully will give the room a more mysterious, taller look, and some kind of arched front at the end behind the enlarger. I'm going to take a week or so and go back to working on the van, while I let my subconscious figure out what'll look best. Then I'll paint, which is boring but predictable, and finish the job by painting the floor a nice shade of kelly green.
Welcome to the Internet. Now go home.
I post stuff here, on fetlife, and on tumblr. Well, I used to - now I hardly do at all.
Not because of copyright. I understand that when you post something on the internet, you're posting it for everyone to look at, and it's going to get shared around. But the comped-up piece of shit you see above (minus my commentary) is all over the internet - it's far more widely distributed than my original version. Back when I used to read my messages here and on Fetlife, I had 12-20 messages per day about stuff like this. Mostly it was people trying to be helpful and telling me "HEY! Look over here, there's another person who smeared shit all over your
The Dining Philosophers - a Problem
Epicurus muttered, "None of this affects me at all," excused himself, and slipped out the back door practically unnoticed. That left the table unbalanced. On one side were the ancient worlders: Plato and Aristotle, heads together in deep discussion, and Socrates, who appeared to be gently questioning Miletus while Sextus Empiricus studiously withheld judgement on the proceedings.The opposite end of the table was mostly held by the enlightenment gang, with Lao-Tze as the sole outlier, holding down the farthest end of the table as he watched the proceedings, imperturbably. Voltaire had given up on his hopes of getting Lao-Tze to appreciate his
One Reason...
.... why I try not to comment about people's weight.
I used to attend a particular conference on an annual basis, and so I got to (casually) know the other "regulars" who also used to be there. Every year, more or less, I'd see the same group of people at the speakers' dinner, and we could catch up on the usual "what are you up to these days?" kind of stuff. One of the guys I used to see fairly often was a tall heavy-set fellow (some might call him "fat" or "obese") he'd always been tall, bearded, and big, to me. But one year, he showed up and he had lost a lot of weight. It took me a second to recognize him, and I said, "Hey, Rich! You look
The Rolling Blunder - OutBlundered
Prequel: :thumb246480458:
Final Push
Last year I published a journal entry about my project van (AKA "The Rolling Blunder") - an old Verizon phone company step-van that I got for not-a-whole-lot-of-money with the brilliant idea of turning it into a rolling darkroom/camper so I could take my wet-plate photography out onto the highway. My secret master plan was to run down to New Orleans, then hang a right across Texas and to California, taking wet-plate photos of vintage diners and laundromats (what, don't you like diners and laundromats?) eventually making the loop up across California then to Seattle, down across Oklahoma, toward home.
I
© 2011 - 2024 mjranum
Comments20
Join the community to add your comment. Already a deviant? Log In
You’ve got a darkroom, a real nice big darkroom!! Oh, wish I had one, lol. Back in the dark ages before digital photography I worked at a custom photo lab, mainly I was the B&W department. I didn’t do tray processing at work; we had a Kodak Royal Print processor, a cool machine, get a dry B&W print in less than a minute. It only worked on RC paper so I did my paper printing at home stooped over the bathtub as my sink, not the best darkroom but if you had to go you didn’t need to leve the room. I would love to have a good room like yours to work in. I guess I’ll just have to enjoy your work more
The only image I could see the enlarger in is the safelight photo, what kind is it? Holy sodium thiosulfate Batman, you’re using the collodion process. So cool! Have you a copy of “The Keepers of Light”? For an old photo geek like me it’s my favorite book.
The only image I could see the enlarger in is the safelight photo, what kind is it? Holy sodium thiosulfate Batman, you’re using the collodion process. So cool! Have you a copy of “The Keepers of Light”? For an old photo geek like me it’s my favorite book.